So there were a few delays, none of which were the fault of Hansons builders. One of their employees tragically lost his life so understandably production was paused. Then there was some damage to the panels at the workshop resulting in another delay.
On Monday 15th Sept, Mike and Kyle arrived at 7am with the studio loaded in their lorry. Unfortunately, wind speeds of 45 – 55 mph are not advisable for carrying large panels.

Five days later they made the same 2-hour trip from Yorkshire to be greeted by a generous Lancashire downpour.

Those guys don’t mess about. 6 hours later these coffee-fuelled workhorses had constructed this beautiful studio!

I’m so pleased. Now I just mopping up and getting used to having my own real studio!