Using the string line to locate the “shuttering” – the metal girders used to hold the concrete in place. The boys were helpful to hammer the pins in place and hold the laser level to get the height right.

The gap at the side is for digger access to bring in the Motorway planing (finer, dark stone, great for levelling.)

We’re ready to pour! Hopefully next week we will lay insulation boards, then bring in the concrete. The pipe is so that the electric cable can be inserted after the concrete is poured.